Skip to content
SecondTuesday

SAP Plant Connectivity

1 notes since January 2023.

Priority is derived from CVSS, not SAP’s priority: CVSS 9.0 or higher is Critical, 7.0 or higher High, 4.0 or higher Medium, below 4.0 Low. SAP’s own priority is only on SAP for Me (SAP login required).

Patch DayNoteTitlePriority (derived from CVSS, not SAP’s priority)CVSS
June 20233301942Missing Authentication in SAP Plant Connectivity and Production Connector for SAP Digital High7.9